SIMEM Underground grout plant and pumps supporting New Zealand’s largest transport infrastructure project ever. The City Rail Link is a game-changer for Auckland.

Auckland’s first underground rail line- due for completion 2024 with SIMEM Underground grout plant and pumps supporting New Zealand’s largest transport infrastructure project ever.

The City Rail Link FAQ

  • The City Rail Link is a game-changer for Auckland. It’s the largest transport infrastructure project ever to be undertaken in New Zealand.
  • It allows the rail network to at least double rail capacity. New rail transport growth statistics suggest that by 2035, CRL stations will need to cope with 54,000 passengers an hour at peak travel times, rather than the original estimate of 36,000.
  • The CRL is a 3.45km twin-tunnel underground rail link up to 42 metres below the city centre transforming the downtown Britomart Transport Centre into a two-way through-station that better connects the Auckland rail network.

More info here: CITY RAIL LINK